1.5.3.6            Hot Standby SCADA node at no charge

A copy of the SCADA node, with a downloaded database ready to run can be down easily by installing SCADA node software on the PC.  Without the Hardkey, this will run in simulation mode for 2 hours (DDE and the API would be disabled). Users can move the Hardkey from the primary SCADA node to the Hot Standby.