21.5.10                Electricity

The Electricity resource type requires the Active Energy field be filled.  The additional fields are optional and used in some Rate Calculation to track cost of electric power. The Rate Calculation is also optional.

Figure 3.10  Electricty Item. Only Active Energy is required.