5.17.2                     Shift Report

Figure 5.49 - Shift Report of Energy Usage, central steam plant. - VIEW

 

The first Shift of the current Day opens first in VIEW and ViewDAQ.

 

The Shift Report consists rows data for the user defined Shift Period. There can be up to 6 shifts per day.

 

The each row can represent from 5 minutes to 60 minutes (1 hour) of data.

There can be 12 Columns per report (twelve tags). Each “cell” can represent the Average, Last Value, Minimum, Maximum or Total for the time-period the row represents (5 min to 60 minutes).

 

Summary Data at the bottom of each Column can be calculated: Maximum, Minimum, Average and Total for the column.

 

If the Shift is not complete, you will see blank rows of data for the future hours.  Click Prev Shift or Prev Date to see the most recent complete report if the current shift is not complete.

 

Emailed Shift Reports appears almost identical, with Magenta and Blue borders.