Preparatory work

Previous chapterNext chapter Show allShow all    Hide allHide all

We need some preparatory work, before we can test our batch archive in the Runtime. In order to create some batches, we have to be able to start and stop the archive. Usually this is done with a variable from the PLC. If e.g. the batches are shifts, this also can be done time triggered. In our example we will do this by hand.

 

As we now have the functions for the control of our batch archiving, we still need some buttons for our new functions.