General |
Manual -> Production and Facility Scheduler (PFS) -> General |
Show all Hide all |
In the zenon Editor, the optional Module Production & Facility Scheduler (hereinafter named PFS) is integrated into the Project Manager.
Illustration 1 represents the Production & Facility Scheduler, with no data configured yet.
The PFS enables actions to be executed in relation to a specific period of time or according to a time model.
The PFS can be configured in both the Editor and Runtime environments. Configuration within the Runtime environment can be restricted by applying user rights. All configurations established in relation to the Runtime environment can be read back to the Editor; otherwise these configurations are specific.
All time indications provided are independent of time zones as well as winter and summer times.
Info |
Should the project window not be displayed
once the editor has been launched, you can load it manually; to do
so, open the menu |