Absolute time |
Manual -> Production and Facility Scheduler (PFS) -> Object types -> Calendar object -> Absolute time |
Show all Hide all |
In order to execute absolute switching points
on a specific day, the relevant schedule must be linked to the
required day. To do so, select the Schedules
cell on the required day.
Open the context menu to access the schedule selection dialog, and
create the link. The linked schedule identification is input into
the cell. In Day view, these schedules can be displayed in full
detail.