Absolute time type |
Manual -> Production and Facility Scheduler (PFS) -> Object types -> Time object -> Absolute time type |
Show all Hide all |
Times are directly defined in the Time field. If the schedule is linked to a specific day, any active switching times linked to the absolute time point are executed. The Offset field is of no importance here.
The Equipment cycle and Model allocation fields aren't used here, either.