2.2. Configure PRT Routes

2.2.1

Open the PRT Route Configuration dialog box.

2.2.2

Enter the SCHEDULE to LOAD Route basic specifications.

2.2.3

Enter the SCHECULE to LOAD Route advanced specifications.

2.2.4

Finish the SCHEDULE to LOAD route configuration.

2.2.5

Add more routes to TRK61.

More information