Planned switchings for CHPs |
Manual -> Energy Management System (EMS) -> Multi-level combined heat and power plants (CHPs) -> Planned switchings for CHPs |
Show all Hide all |
When planning the set value inputs for a CHP, the conditions for the set value inputs must be taken into consideration. If several levels of a CHP are necessary in order to cover the output, keep in mind that it is only possible to switch from one level to the next level when executing a switching schedule. At that the set value inputs for each level must be in accordance with the delay times for the switch-on and switch-off of each level.
Attention |
You must consider that the forewarning is only given at a defined level setting. Thus you must regard the length of the forewarning time for the individual levels when creating the switching schedule. |