Alarm engineering with filters

Previous chapterNext chapter Show allShow all    Hide allHide all

The Alarm engineering is done in the Project properties in Alarm administration / Column setting (tab Entry in the list) or when a picture switch to a picture of type AML is performed (all tabs).

The dialog Settings for the alarm administration is opened.